Construction photos
The following photos of the construction of the RiverCenter for the Performing Arts were taken on June 23, 2000.
 Main entrance to the Music Library, which is located on the first floor to the right of the double-door.
 The Music Library from the main lobby area.
 The Music Library looking from the rear of the facility to the front entrance.
 Music Library public service desk.
 Music Library periodicals/reading room.
 The clock tower outside the Music Library.
 The main entrance is to the right of the narrow white columns.
|